Select Currency
Translate this page

ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 72  |  2350 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA

 

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND TO THE STUDY

Until relatively recently, the discipline of development appraisal has remained the provenance of surveyors and developers. It largely been ignored by other participants in the development process, particularly planners, architects and construction specialists. This is now changing. Close attention is now paid to the feasibility and viability (and profitability) of development proposals as government and other stakeholders seek to extract developer and/or landowner contributions to affordable housing, public services and infrastructure. Consequently the theory, application and outputs from development appraisal are under intense scrutiny from a wide range of users. Since Circular 05/05 proposed the submission of financial information‟ to provide a basis for negotiations between developers and local planning authorities about viable levels of affordable housing, tests of the financial viability of development projects have become an integral part of the planning process, both at the forward planning and development control stages. At the large-scale, macro-level Strategic Housing Land Availability Assessments require proposed plans to be achievable.

However, the timeframe for development can be decades rather than years and, as a result, generating detailed and reliable cost and revenue projections can be impractical. At the other end of the scale, viability appraisals are carried out to inform negotiations about affordable housing levels for a scheme about which there may be a high level of information on permitted development and expected costs over a relatively short timeframe. In terms of critical evaluation from the real estate academic community, development appraisal has remained something of a backwater. In contrast, often linked to market traumas, over the last four decades methods of appraising standing investment properties have been the subject of widespread academic and professional debate. Whilst the RICS monitors variance and accuracy of investment valuations, there is no comparative institutional evaluation of the performance of development appraisals. Nevertheless, conventional development viability models have been subject to some criticism, particularly their simplified composition, failure to mirror reality and theoretical weaknesses.

1.2 PROBLEM STATEMENT

The general low usage of formal feasibility and viability appraisal techniques by contractors and developers globally often culminates into project failures, incessant claims for variations, huge financial losses and sometimes brings discomfort for people who came to enjoy themselves at these recreational centres. (Allan et al, 2007). This situation is more prevalent in redevelopment projects due to the inevitable problems of unexpected additional work, excessive requirements and scope management issues, project funding not aligned with project plans, delay, structural failure, cost overrun, etc (Naaranoja and Uden, 2007). These problems or uncertainties, among others, increase the project risk and make their management crucial if success is desired.

Some construction projects in Owerri Urban have been abandoned due to poor or no feasibility and viability appraisal on them, while some recreational developments Owerri Golf Club, Silver Bird Cinema etc have stood the test of time, due to proper planning and forecasting. This huge expenditure and apparent failure in the primary objectives of the project led to complaints, probe panels and subsequent abandonment of the project. Research has shown that financial, political and physical risks are the most significant to Nigerian Contractors (Dada, 2010). However, of the different levels of risk (country, market or project), there is shortage of research as to how Contractors approach project planning at organisational level.

1.3 RESEARCH OBJECTIVES

To explore feasibility and viability appraisal techniques used by Contractors of capital projects in Owerri Urban.

To assess awareness and usage of formal feasibility and viability appraisal techniques by Contractors in Owerri Urban.

To examine the success or failure of the feasibility and viability appraisal methods by Contractors in Owerri urban.

To evaluate the impact of feasibility and viability appraisals on the development of capital projects in Owerri Urban.

1.4 RESEARCH QUSTIONS

What feasibility and viability appraisal techniques are used by capital project contractors in Owerri Urban?

How do you gather information about newer feasibility and viability appraisal techniques and strategies to be applied in your on-going projects?

What are the impacts of feasibility and viability appraisal on the development of capital projects?

1.5 RESEARCH HYPOTHESIS

Ho: There is no significant relationship between feasibility study and the performance of contractors.

Hi: There is a significant relationship between feasibility study and the performance of contractors.

Ho: Feasibility study does not enhance quality deliverable in capital projects.

Hi: Feasibility study enhances quality deliverable in capital projects.

1.6 SIGNIFICANCE OF THE STUDY

This study gives a clear insight into the various ways in which Capital Project developers and owners in Owerri can maximise efficiency and profits through effective and efficient application of feasibility and viability appraisal methods and techniques. The study also gives a clear insight into the various impacts of feasibility and viability appraisal methods on the development of recreation properties in Owerri. The findings and recommendations of the researcher will help in building a strong and better appraisal technique and strategies for Capital Project developers in Owerri state. The impact of feasibility and viability on Capital Project development in Owerri Urban are outlined in-order for drastic measures to be taken to tackle any challenge property owners and developers may face when developing recreational centres in Owerri state.

1.6 SCOPE OF STUDY

This research focuses mainly on the impact of feasibility and viability appraisal on the development of capital projects in Owerri urban. Results and recommendations may not be used to generalise other Cities in Nigeria, as the researcher could not cover a wider scope due to financial and time constraints. Based on the findings of this study other possible researchable areas may include studies on the various effects of other aspects of recreational development such as property laws in Nigeria and property management and control.

1.7 LIMITATION OF THE STUDY

The only limitation faced by the researcher in the course of carrying out this study was the delay in getting data from the various respondents. Most respondents were reluctant in filling questionnaires administered to them due to their busy schedules and nature of their work. The researcher found it difficult to collect responses from the various respondents, and this almost hampered the success of this study.

1.8 DEFINITION OF TERMS

Definitions of terms serve as the dictionary of this research.  The terms are defined to enable the reader understand the research more clearly.

Feasibility:  Erikson (2002) defined feasibility as an evaluation and analysis of the potential of the proposed project which is based on extensive investigation and research to give full comfort to the decisions makers. 

Viability: According to Simmons (2007),Viable or viability is the ability of a thing (a living organism, an artificial system, an idea, etc.) to maintain itself or recover its potentialities.

Capital Project: this refers to long term investment requiring relatively large sums to acquire, develop, improve, and to maintain.

REFERENCES

Allan et al, 2007 Techniques for Effective property management  (A John Wiley & Sons, Inc., Publication Hoboken, New Jersey. Published simultaneously in Canada.)

Erikson O. U., (2002) Urban Planning and development in a Depressed Economy.Unpublished M.Ed. Dissertation Submitted to University of Ibadan. Ibadan

Naaranoja J.K and Uden P.I., (2007).  Principle and practice of Feasibility Studies In Nigeria (Owerri: Springfield publishers, 2006) p.31

Simmons P.K. (2007) Understanding Feasibility and Viability Analysis New York: Westside Publishers.

  DOWNLOAD THE COMPLETE PROJECT

ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!