Select Currency
Translate this page

AN ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 82  |  2789 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CHAPTER ONE

INTRODUCTION

1.1   BACKGROUND TO STUDY

Productivity has become the buzzword of the time as it is generally agreed that the more productivity the better.  However, productivity in construction industry is discouragingly low. The effect of this cannot be overemphasized. Aboyade (1966) believed a country's development process depends on the capacity of the country's construction industry, which accounts for half of the country's fixed capital accumulation. Horneir (1987) confirmed the importance of construction industry by asserting that 10% increase in construction labour productivity will represent an enormous annual saving.  Productivity reflects a variety of factors acting together to increase the value of output faster than the cost of input. Mc Beath (1974), Nwaroh (1987) and Kendrick (1977) found Mali's (1978) definition of productivity acceptable. Mali (1978) defines productivity as "the measure of how well resources are brought together in organization and utilized for accomplishing a set of results" that is productivity is reaching the highest level of performance with least expenditure of resources. Riggs and Felix (1983) and Bain (1982) said as much when they stated that productivity Is not a measure of output produced; rather it is a measure of how well resources are combined and utilized to accomplish desirable results. It is, therefore, apparent that construction industry in Nigeria is a major contributor to the gross national product (GNP). Nwachukwu (2002) classified this industry under four main segments.

(i)  The building segment

(ii)     The civil segment

(iii)    The mechanical/electrical segment

(iv)     Industrial/heavy Engineering segment.

According to him, Nwachukwu (2002), the building industry segment in Nigeria constitute about 67% of the total construction activities in the country. Unfortunately, building construction site in Nigeria are currently passing through gloomy and difficult time as oppose to what used to be the boom situation in the early seventies, many factors such as high dependant of foreign building material and technology, lack of adequate finance, unfavorable government policies etc, have been identify as some of the problem of lack of productivity in construction work environment which has resulted to project abandonment, project failure, project delay. Another major problem that has recently attracted the attention of building stakeholders in the industry is the issue of "UNSKILLED" in the construction environment which has resulted to low productivity on building environment. This state of affairs does not represent a good image for the industry, hence the need to ask question "What can be done" it is against this background that this research an assessment of the impact of work environment on the productivity of construction skilled worker. A case study of Imo state Nigeria was conserved.  

1.2     STATEMENT OF THE PROBLEM                   

Most construction project site in Nigeria is being managed by unqualified person who lacks the requisite capacity to identify test of work environment. Investigation have shown that there is serious declined in the number of young men and women taken up vocation or apprenticeship in specialized construction place. This has created a situation where most men and women (unskilled construction workers) who don't have proper and adequate training on the construction work environment and its procedures, such scenario constitute a serious problem to the building process not only in term of poor quality work, delay or abandonment of project but also term of low productivity which hinder national development. Many factors are internally generated this controllable by management, some factor are however beyond management control (e.g. nutrition type of workers, change in climatic condition etc) and their impact are beyond the scope of the present discourse.  

1.3   AIM AND OBJECTIVES  

The aim of this study is to assess the efficiency and productivity of construction skilled workers in Nigeria with Imo state as a case study. The objectives of the study are as follows

1.  To identify productivity factor in the construction work environment.

2. To what extent can skilled workers contribute to the productivity and successful project delivery?  

3. To determine whether construction skilled workers are productive or not.

1.4    RESEARCH QUESTIONS       

The study would consider the following question.

1. What are the major factors that contribute to productivity on the construction       environment?  

2. What strategies can be adopted for measuring productivity and performance on site?

3. To what extent can skilled workers contribute to the productivity and successful project delivery?

4.  How does this factor contribute to achievement or non achievement of project target on site?

5.  To what extent can unskilled workers contribute to waste of resources, failure or unsuccessful project delivery?  

6.  How effective are these factors when applied. This study would attempt to provide answer to the above question.

1.5  SIGNIFICANCE OF STUDY

Productivity has a great significance in construction labour productivity constitute a significant part of production input for construction project. In the construction industry, many external and internal factors are never constant and are difficult to anticipate. This factor leads to continuous variation in labour productivity. It is necessary to make sure that a reduction in productivity does not affect the plan and schedule of the work and does not cause delay. The  consequences of these delays could result in serious money losses. Further, considerable cost can be saved if productivity is improved because the same work can be done with less manpower, thus reducing overall labour.          

1.6   SCOPE OF THE STUDY   

The study would be of immense value to all the construction skilled workers in the construction work environment in Nigeria. It hopes to suggest way for improvement of performance, permit efficient utilization of resources as well as to promote knowledge and research general issue of productivity on construction industry in Nigeria. Above all the study would contribute to the growth of construction industry in Nigeria and then strengthen the nation economy.      

1.7   THE LIMITATION OF STUDY  

Although the focus of the study is Nigeria, the study is limited to southeast Nigeria. It is believed that construction skilled workers are not illiterates and have the same character nationwide. Therefore the situation/workforce behaviors are the same. Productivity assessment for the purpose of this study is only limited to construction and work environment. It is hoped that the study would achieve the intended aim and objectives.  

1.8    DEFINITION OF TERMS   

PRODUCTIVITY: it is the relationship between goods produced or a service provided and the resource consume in doing it (TOFFIAR 1981)  

ASSESSMENT: the value or amount at which something is calculated; it is the judgment or opinion of something.  

SKILLED WORKER: it is also known as tradesmen, these are any worker who has some special skills, knowledge or ability in their work especially in the construction industry.  

CONSTRUTION SITE: Pieces of ground were building construction or construction works/activities takes place.  

ENVIRONMENT: This the sum total of all internal and external influences and condition affecting construction in developing activities.

  DOWNLOAD THE COMPLETE PROJECT

AN ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON AN ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on AN ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on AN ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for AN ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!