Select Currency
Translate this page

CONTROL ROD CALIBRATION OF NIGERIA RESEARCH REACTOR -1 (NIRR-1) USING POSITIVE PERIOD METHOD

Format: MS WORD  |  Chapter: 1-5  |  Pages: 73  |  3437 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CONTROL ROD CALIBRATION OF NIGERIA RESEARCH REACTOR -1 (NIRR-1) USING POSITIVE PERIOD METHOD

 

ABSTRACT

Calibration of control rod has become an essential tool for measuring the reactivity changes in a reactor. The Positive Period Method of control rod calibration was shown to be a relatively independent, more accurate and well suited to the core configuration and control rod mechanism of low power reactors. The Nigeria Research Reactor-1 (NIRR-1) is a low power Miniature Neutron Source Reactor (MNSR). In this work, NIRR-1 control rod was calibrated from 107mm to 177mm withdrawal length at a low flux of 5 x 109 ncm2s-1. This flux and length was chosen to contain effects on reactivity due to temperature variation. Doubling times measurements were carried out in conjunction with the “Inhour” data to obtain reactor periods and their corresponding reactivities. The integral reactivities obtained were plotted against control rod withdrawal positions. The plot was compared with the s-shape integral curve earlier obtained for NIRR-1 during the zero power experiments in China and the two figures were found to be in agreement. The integral rod worth of (3.34) mk obtained here was also compared with the in-built full rod length total reactivity worth of 7mk and was found to have accounted for 47.8% of the length. This result is an indication that 10mm withdrawal length is approximately equivalent to 0.56mk reactivity insertion and the length used here is the most reactive portion of the control rod. It also shows that only 30% of the control rod length is required to achieve the characteristic s-shape curve using the positive period method. The uncertainty of 3.29% obtained in the integral rod worth is found to be within the margin of experimental results. This has satisfied the safety requirements of MNSR for shutdown margin. Our work has demonstrated that routine calibration of the MNSR control rod via positive period method is possible and satisfied all safety requirements, and thus recommended.

 

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND TO THE STUDY

The central characteristics of a nuclear reactor are its controllable, self-sustaining fission chain reaction which releases useful neutrons and energy (CNSC, 2003). This controllability was shown to be greatly achieved via control rod motion and as such the knowledge of a reactor‟s response to specific control rod motions is essential for the safety, efficiency, operation and durability of a nuclear research reactor (Souza and Mesquita, 2010). Research reactors are nuclear reactors that are majorly neutron source. Also called non-power reactors, the major contrasts between them and power reactors are that power reactors are utilized for electricity production, heat generation, or maritime propulsion while the neutrons produced by a research reactor are used for several purpose which include scattering, non-destructive testing, analysis and testing of materials, production of radioisotopes, research and public outreach and education.

Research reactors comprise a wide range of civil and commercial nuclear reactors which are generally not used for power generation (Ahmed et al, 2006). Over 270 research reactors are currently operating in more than 50 countries (Parrish and Nicholas, 2007). Research reactors are separated into various classes of which one of such is the Miniature Neutron Source Reactor (MNSR) which the Nigeria Research Reactor-1 (NIRR-1) fall under. The Nigeria Research Reactor-1 (NIRR-1), is the 8th commercial Miniature Neutron Source Reactor (MNSR) designed by China Institute of Atomic Energy (CIAE). First criticality was achieved on 03 February 2004. It is particularly designed for use in neutron activation analysis (NAA) and limited radioisotope production.

  DOWNLOAD THE COMPLETE PROJECT

CONTROL ROD CALIBRATION OF NIGERIA RESEARCH REACTOR -1 (NIRR-1) USING POSITIVE PERIOD METHOD

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON CONTROL ROD CALIBRATION OF NIGERIA RESEARCH REACTOR -1 (NIRR-1) USING POSITIVE PERIOD METHOD INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on CONTROL ROD CALIBRATION OF NIGERIA RESEARCH REACTOR -1 (NIRR-1) USING POSITIVE PERIOD METHOD?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on CONTROL ROD CALIBRATION OF NIGERIA RESEARCH REACTOR -1 (NIRR-1) USING POSITIVE PERIOD METHOD?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for CONTROL ROD CALIBRATION OF NIGERIA RESEARCH REACTOR -1 (NIRR-1) USING POSITIVE PERIOD METHOD, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!