ABSTRACT

The effects of electric power interruptions resulting from severe power outages were investigated and analyzed using five cold rooms as a case study. Two approaches have been developed and used. One is based on customers‘ survey that mainly investigates the preparatory actions that a customer may take to reduce the effect of outages. The other one is based on a mathematical model using standard deviation as a measure of dispersion. The spearman‘s correlation factor with the aid of visual basic program was used to X-ray the cost implication involved in running these cold rooms with the utilization of power supply from PHCN to be more economical than powering from individual power generating sets. Furthermore the regression cost analysis showed that cold room 1, cold room 2, cold room 3, cold room 4, and cold room 5 have a spearman correlation factor of 40.04%, 41.93%, 39.16%, 31.97% and 31.09% respectively, which shows how expensive the use of private power source over using PHCN, while the frequency distribution of power outages stood at a standard deviation of 3.78.

 

CHAPTER ONE

INTRODUCTION

1.1  Background of Study

Electric power interruptions occur when system capacity, due to severe power outages, is insufficient to meet the system load levels. During these periods of inadequacy, outage costs will be borne by the utility, its customers and perhaps, by' the entiresociety. The utility outage costs include loss of revenue, loss of future sales and increasedrepair expenditure and maintenance. These costs usually form only a smallpart of the total outages costs. The greater part is that borne by the consumers. Theoutage costs depend on many factors and situations, some of which are discussed inthe following sections. The problem of estimating outage costs is affected by the perceivedcosts of an electric outage and the point in time when a consumer would like tobuy electric energy but is unable to do so. Since there are different classes ofconsumers,each will tolerate loss of service differently.

A residential consumer may suffer agreat deal of hardship if an outage occurs during a hot summer day or while he is engagingin domestic activities but it may be of little inconvenience to a commercialuser who is forced to close until power is restored. Also an outage may cause a greatloss to an industrial user if it occurs during the time of the production process. Therefore,consumers do not perceive service interruption to the same degree of hardship.The outage costs to a particular consumer depend also on the alternatives availableto that individual at the time of service interruption. If the outages are not expected,the consumer may have very limited alternatives and may incur a great loss. 

  DOWNLOAD THE COMPLETE PROJECT

ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ASSESSMENT OF THE IMPACT OF POWER OUTAGES ON COMMERCIAL CONSUMERS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!