CHAPTER ONE

INTRODUCTION

Water is an indispensable and inevitable substance to all living things due to its usability and high priority among other substance and materials. Provision of large volume of waters essential due to its significant purpose, which therefore called for a means by which sufficient, and good quality water can be obtained. There are different types of water namely; well water, pipe-borne waters, rain water, stream water, river water e.t.c.

In the earlier days, the use of buckets and calabash is employed in fetching water for homes, agricultural and domestic’s uses. Later, hand pumps were developed to reduce the stress and the inconveniences and other forms of contamination’s which arise due to direct contact of the body to the available water for consumption. Besides, only a small quantity of water can be made available due to physical factors such as tiredness, distance and climatic factors like dry season. Hence, to eliminate these difficulties, pumping machines is employed to perform the job of fetching water and storing it in storage tanks for future purpose. The system consists of connecting pipes, water pump, which is connected to electric power supply and operated manually. In order to fully eliminate the stated problems and future needs for large volume of water, the concept of automatic pumping machine is developed.            
This project emphasizes on the construction of automatic pumping machine which in turns provide a simple logical, versatile and economical/circuit which turns on the pump when water in the tank fall below the minimum level and also off process is achieved by the incorporating of the following to the pumping system:
The sensor: This measures the physical states such as the level of the water.
The responder: which responses to what is being sensed, it comprises of electrical and mechanical devices.
The actuator: This actuates the responder to sense the water level in the tank to perform the switching operation. In summary, the automatic control system is very effective, efficient and consequently reduces labour cost, flooding, man power and provides enough water for usage.
Background of the study
This project is carried out so as to provide a means of reducing stress involved in fetching water, wastage of water and flooding which may result from overfilling of the tank and eventually reduce to minimum, if not eliminating damages to the pumping machine.
Aim and Objectives
The aims and objectives of this project are:
1.    To reduce the labour involved in operating pumping machine manually.
2.    To prevent or protect the coil of pumping machine from being burnt as a result of continuous work beyond its operating time.
3.    To pump water automatically from water sources.
4.    To prevent wastage of natural resources (water in particularly) and flooding of premises.
5.    To prevent the machine from sucking mud and or air when there is no water in the well or source of water supply.
Scope of the Study
The project is design to provide a means of storing water for the benefit of mankind and industrial purpose. The control section is used for the control of water level to various sizes of tank or reservoir. The minimum and maximum level of water in the tank is determined by the probe.
Significance of Study
The significance of the study is to design a means of mankind water available in the storage tank for future uses such as domestic, industrial, Agricultural and economic purposes, which are beneficial to mankind. It is also reduce labour coil, wastage of water resulting from filling of the tank, which can eventually leads to flooding. Consequently it enables long life span of the pumping machine.
Methodology
In the course of searching for information on this project, we consulted some learned professionals, lecturers, relevant textbooks, such as electrical drafting and design for the HND students, journals and past project reports in the library of the institution e.g Federal Polytechnic, Ede, Osun State, and browsing on the Internet to acquire relevant information on the design and construction of the project.
Limitation of the Project
The major limitation of the study is that it cannot be used when there is no power supply from Power Holding Company of Nigeria (PHCN) unless an alternative means of power supply is designed to power the project.

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND CONSTRUCTION OF AUTOMATIC PUMPING MACHINE FOR WATER SUPPLY

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND CONSTRUCTION OF AUTOMATIC PUMPING MACHINE FOR WATER SUPPLY INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND CONSTRUCTION OF AUTOMATIC PUMPING MACHINE FOR WATER SUPPLY?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND CONSTRUCTION OF AUTOMATIC PUMPING MACHINE FOR WATER SUPPLY?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND CONSTRUCTION OF AUTOMATIC PUMPING MACHINE FOR WATER SUPPLY, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!