DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR

Format: MS WORD  |  Chapter: 1-5  |  Pages: 43  |  1493 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR

 

CHAPTER ONE

1.1     INTRODUCTION

Change over switch is a device used to switch off a power supply and subsequently switch on another power source. Basically it is aimed at switching on a more convenient power supply to the load. Since it switches on power to the load precaution has to be taken while choosing the type of change over switch. Also size, arcing control are put into consideration in the choice.

A good switch should be the one whose contact is made in such a way as to limit the arc formation by having no contact-bounce and by having contacts made of good conductive, corrosion resistance and wear resistance materials.

A good change over switch must have adequate insulation and must be so constructed and located as not to constitute a potential hazard.

A good change over switch should also have tight contacts so as to limit or eliminate the possibility of partial contacts at the contact point. The partial contact lead to over heating of the components and may lead to fire out break.

1.2     Aims and Objectives

Due to inconsistent supply of power, there is a growing need for an alternative source of power supply. This has led to heavy capital investment in a bid to curb power failure and ensure regular power supply for our industries, hospitals and homes. The problem of power failure can be checkmated with the use of standby generating set.

An Engineering author Tony Rudk Inn said in his book titled "Upgraded signal source with improved performance and reliability" that the cost and depreciation associated with breakdown vary from one application to the other, and in some cases, the user has little choice but to ensure that a stand-by unit is available to take over on event of failure of primary system.

If some of these big firms do not make provisions for stand-by power source, frustration could set in which may lead to the closure of business and thus throwing workers into unemployment. Also in the case of hospitals undergoing a surgical operation and the power supply suddenly goes off, the patient might loose his life due to power outage.

Furthermore, if the President of the country is making a nation wide broadcast and all of a sudden there is power failure in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must go for it.

Sequel to the rate at which more sophisticated electrical/electronics gadgets are being procured an installed in our homes, hospital and business premises, there is a justifiable need for a faster and more reliable change over system in an event of power outage.

In view of these considerations, this project is aimed at designing and constructing a workable automatic change-over switch with phase selector circuit which switches on the load from National Electric Power Authority (NEPA) to a generator when power comes back. Also when there is a phase failure in any of the NEPA phase carrying the load, the change-over switch will be changed to alternative phase.

1.3     SCOPE AND LIMITATION OF THE STUDY

The automatic change over switch is aimed to achieve the following automatic actions.

To start the generator

To change power to generator                                           

To change back to NEPA

To change the generator

To change to alternative phase in case of phase failure.

The automatic change over unit can be operated in single or three phase-system. The automatic change over switch has the following advantages.

i.  It minimizes damage to lives/equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.

ii.  It reduces its change-over timing to the minimum due to its fast response to power outage.

iii.  It maintains high quality of service through its fast and prompt response

iv.  It avoids and reduces fuel consumption since the generator is switch off immediately NEPA supply is restored.

Moreover the size and capacity of the Unit will depend upon the load for which it will be used. The Unit is also portable, easy, convenient and safe to install.

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!