Select Currency
Translate this page

CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF

Format: MS WORD  |  Chapter: 1-5  |  Pages: 42  |  1719 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF

 

ABSTRACT

As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually to every thing they do. A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds with out going through the point for manual operation. This project writing were organized in according way for easy understanding.

 

CHAPTER ONE

INTRODUCTION

BACKGROUND OF THE STUDY

This project is on the design and implementation of automatic change over and how it can be used to change from one power sources to the other automatically. The design comprises some arrangement that senses the power failure form either of the power sources and drives the electro mechanical switching device (relay) that is capable of changing two poles (live and neutral) to give out light or be on stand by to generator side.

As technological advancement has been on the increase in our society many have fallen in love with technology and wants to have a feel of modern technology in virtually to every thing they do. A design have been made in combination of electrical and electronics to change over from one power sources to the other automatically without many operation.

Electronic components such as relay transformer diodes were used thereby making the project less expensive for the implementation of the project and commercial application. Moreso the cost suitability and availability of the required components for the project circuitry were some of the major factors considered by the designer.

OBJECTIVES OF THE STUDY

To design a circuit that will automatically change over from main power supply (PHC) to power generating set and vice versa with the help of electro mechanically switching device that is being controlled by electronics component.

SCOPE/SIGNIFICANCE

This project design can be used to transfer power sources to the other automatically. The design could also be used in other application apart from changing power sources once there is a well though arrangement.

PROJECT REPORT ORGANIZATION

The project report has been organized into five chapters for orderliness and easy understanding of the information on the report design. Chapter one contains introduction design objectives/aim scope/significance of the report and report organization. Chapter two dealt on system component analysis literature review and theories/modules of design. Chapter three contains the system design description of the system building blocks system specification block diagram and the description of the overall operation of the system. Chapter four describes the implementation testing and results of the project. Chapter five finally dealt on the cost analysis calculation and recommendation for further improvement and ended with a page for references.

  DOWNLOAD THE COMPLETE PROJECT

CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!