Select Currency
Translate this page

THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 68  |  2840 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS

 

CHAPTER ONE

INTRODUCTION

1.1 Background of Study

A clear understanding of risk management process and practice within the construction industry is an important model for exploring the application and barriers of risk management in Nigeria. It will also help in identifying the ever present risk factors and their probability of occurrence in Nigerian projects. This chapter summarizes the whole work carried out for this study. Risk concept varies based on people’s understanding, experience and attitude (Belel and Mahmood, 2012). Many people recognize events in a dissimilar way due to different attitude, emotions, judgments and beliefs. This means that the definition of risk will differ to different people. Risk in its simplest form means uncertainty with recognized probability distribution (Barkley, 2004). According to Holmes (2002), risk is not the actual being of a problem rather it is a possibility that a certain problem may arise in the future. Baloi and Price (2003) define risk as the likelihood of an unfavorable incident occurring to a project. It is widely accepted across the construction management society that a project risk is any event or series of events, whether motivated internally or externally, that when occurred will negatively affect the project objectives of functionality, performance, time and cost(Devripasadh, 2007). Risk within the construction industry is understood to be a mixture of activities that can affect the project goals. Risks are major component of the overall cost of projects and their distribution has significant effect on project financial plan.

Project management is the scientific application of skills, tools and technique to fulfill project activities in order to meet the expectation and requirement of clients or stakeholders (Deviprasadh, 2007). A project is always trying to bring in some type of modifications or changes, a new invention, work or structure. This change involves uncertainty, which cause projects to have a possibility of being blown off by a possible future event. Risks and uncertainties are present in all activities of a construction project (Odeyinka, 2000). It is very important to know the distinction between risk and uncertainty (Carpenter and Frederickson, 2001). According to Hillson (2004) risk is measurable uncertainty while uncertainty is immeasurable risk.

Risk management is a comprehensive and systematic way of identifying, analyzing and responding to risks to achieve the project objectives (Banaitiene and Banaitis, 2012). It is also defined as a planned form of identifying and evaluating risk and selecting, establishing and applying options for the handling of the risk (Kremljak, 2004). It is the recognition, prioritization and appraisal of risk followed by an organized resource application economically to reduce, monitor and manage the possibility of unfortunate events or to maximize production or outcome (Ehsan et al. 2010). The basic function of insurance is risk transference; risk is transferred from one party (the insured) to another party (the insurer). The transfer of risk by no means eliminates the possibility of misfortune, but the insurer provides financial security and tranquillity for the insured when the insured risk occurs. In return, an insured pays a premium in a very small amount when compared with the potential losses that may be suffered (Morton, 1999).

1.2 Statement of Problem

Development of infrastructure is one of the key drivers in business over the globe; it increases the GDP of a nation (Awodele et al. 2009). This encourage countries to prioritize infrastructural development and make provisions in their budgets for financing its infrastructure. This leads to new challenges considering the risks involved in the design and production. Construction projects due to its nature allows a lot of possibilities for many environmental, socio-political and other problems during pre-contract, contract and post-contract stage leading to completion time problem, cost overruns or exceeding budget in projects and poor quality finish (Akintoye and Macloed, 1997). In order to avoid or reduce the losses, management of the risk involved in the construction project is required. Nevertheless, saying Nigerian construction industry is poor, is an understatement as the industry is characterized by frequent setbacks or interruptions, cost overruns and abandonment of projects (Awodele et al., 2009). These are caused by different kind of risks involved in construction projects. Risk factors are believed to be familiar to Nigerian construction professionals, yet the probability of occurrence and its impact at precontract and post-contract stage is yet to be investigated. However, there are few researches conducted on risk management within the construction industry in Nigeria. In Nigeria, the construction industry mainly depends on government’s budget and the industry is performing very poor due to avoidable risk. The need for understanding how to manage project risks becomes a very important issue.

1.3 Research Objectives

The research broadly sought to assess the extent to which SMEs adopt insurance as a risk management tool and the benefits there in. Specifically, the research intended to achieve the following objectives to:

1.  Identify the various construction risk faced by construction industry

2. Examine the response of construction industry towards the use of Contractors All Risk policy (CAR)

3. Assess the benefits Construction industry derive from using insurance as a risk management tool;

4. Identify any problems Construction industry encounter in using insurance

5. Find out solutions to the challenges that construction industry encounter in using insurance.

Research Questions

1. What are the various construction risk faced by construction industry?

2.What is the response of construction industry towards the use of Contractors All Risk policy (CAR)?

3. What are the benefits Construction industry derive from using insurance as a risk management tool?

4. What are problems Construction industry encounter in using insurance?

5. What are solutions to the challenges that construction industry encounter in using insurance?

1.5 Significance of Study

The study would help identify the reasons for the level of patronage of insurance as a risk transfer mechanism and create a changed behaviour of the owners of Construction industry in Nigeria. The research would benefit, risk managers, construction project consultants and building planners by identifying areas that they might need to consider when preparing disaster recovery plans, particularly for construction project. Findings that emerged from the study would serve as a spring board to generate interest for further research into the other aspects of insurance challenges. The research work would also be of enormous assistance to various levels of educational institutions in the country, especially the universities as reference material for further studies and research work on insurance as a risk management strategy. The study would further contribute to the existing literature on mitigating and providing confidence to contractors in their planning decisions.

1.6 Scope of Study

The study was aim at evaluating the impact of insurance to building project in Nigeria with particular to five construction firms in Anambra state. The study recognize some contraction insurance policy in Nigeria.

  DOWNLOAD THE COMPLETE PROJECT

THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!