MODELLING OF COST OVERRUNS IN BUILDING PROJECTS
ABSTRACT
Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self-financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challenges being experienced globally. Construction cost overrun has become a reoccurring phenomenon in the delivery of building projects. The major thrust of this study was to identify, analyse and model the factors that contribute to building construction cost overruns in Abuja. The study adopted a Monte-Carlo technique in simulating cost overrun using DiscoverSim® version 1.1 (SigmaXL, 2013) simulation and RiskAmp Microsoft Excel add-in software to analyse data obtained from literature review, review of project documents with contract sum of over Five Million Naira executed within Abuja city in addition to interview sessions with construction professionals. The study revealed that significant cost overruns are mainly due to re-measurement and variation. The simulation result elucidated that less than 10% of building projects are completed below the initial contract sum in Abuja which could be due to the fact that projects tend to be initiated and executed without adequate project information such as client brief, design details and specifications. The study recommends the need for minimizing occurrence of re-measurement in building projects through provision of full design information prior to contract award, development of simulation model for specific project categories and establishment of a project cost overrun band that will enable a scientific measurement of project’s value for money benchmarked against initial cost estimate.
INTRODUCTION
Globally, the construction sector is inundated with cost overruns in the delivery of building projects. This experience has brought about loss of clients’ confidence in consultants, added investment risks, lack of ability to deliver value to clients, and disinvestment in the construction industry (Mbachu and Nkado, 2004).It is of essence that the objectives of a building contract are met to the contentment of the parties involved. Cost, time and quality are significant, interrelated and interdependent targets for achieving the objectives/goals expected of building contracts (Ashworth, 1999, Gould, 2002). Thus, it is crucial to keep up a proper balance between the three so that project outputs are realised on time, within the financial plan and with the requisite quality (Akinsola and Potts, 1998). However, it is an admitted fact that in Nigeria, the majority of contracts suffer undue time extensions and /or additional cost to the client and /or inadequate quality of work (Oluwole, 2008b).
Project cost overruns can be either avoidable or unavoidable. Overruns due to design plan or project management problems are avoidable because they could have reasonably been foreseen and prevented (Shanmugam et al., 2006). However, there are some unavoidable costs such as those due to unanticipated events which cannot reasonably be prevented. Cost overruns may add value to projects when extra work is done with the intention of producing a better output. Overruns may also add value when they involve work that was omitted from design plans but clearly needed to be done. However, some overruns may not add value and represent wasted money if they do not result in a better product. Cost overrun of a project refers to the actual ‘cost increase’ to the client during construction of a building project (Janaka, 1992). It is merely the difference between the value originally envisaged for the project and the value reflected in the final certificate. Cost overruns occur from overspending the allowances, making changes and encountering unforeseen problems. Proper planning can greatly reduce cost overruns.
DOWNLOAD THE COMPLETE PROJECT
How do I get this complete project on MODELLING OF COST OVERRUNS IN BUILDING PROJECTS? Simply click on the Download button above and follow the procedure stated. |
I have a fresh topic that is not on your website. How do I go about it? |
How fast can I get this complete project on MODELLING OF COST OVERRUNS IN BUILDING PROJECTS? Within 15 minutes if you want this exact project topic without adjustment |
Is it a complete research project or just materials? It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data |
What if I want to change the case study for MODELLING OF COST OVERRUNS IN BUILDING PROJECTS, What do i do? Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
How will I get my complete project? Your Complete Project Material will be sent to your Email Address in Ms Word document format |
Can I get my Complete Project through WhatsApp? Yes! We can send your Complete Research Project to your WhatsApp Number |
What if my Project Supervisor made some changes to a topic i picked from your website? Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
Do you assist students with Assignment and Project Proposal? Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately |
What if i do not have any project topic idea at all? Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373 |
How can i trust this site? We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe! |