CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY

 

CHAPTER ONE

INTRODUCTION

Background of the study

Today‘s construction projects become more complex in nature. The complex,relational and lengthy process of designing and building makes construction a process in which disputes are virtually ensured. Furthermore, the involvement of multidisciplinary in the construction project also leads toconflicts among the parties. It seems that conflict and disputes are inevitable to the construction industry especially when most of construction projects are facing with so many uncertainties. A study by Kumara swamy&Yogeswaran provided a good reference of the common sources of construction disputes that are largely related to contractual matters, including variation, extension of time, payment, quality of technical specification, availability of information, administration and management, unrealistic client expectations and determination. In other research by (Kathleen, 2003a) highlighted conflicts may develop as a result of limited resources such as not enough time, money, labour, materials and/or equipment. Smithdescribes conflict and disputes as an endemic problem in the construction industry. Conflict may difficulties communications between individuals, breaks personal and professional relationships and reduces effectiveness.

Conflict produces tension and distracts team members from performing the task. According to Cheung &Suen, if dispute are not properly managed, they may cause project delays, undetermined team spirit, increase project costs and above all, damage continuing business relationships. Thus it is not surprising that many construction stakeholders still overwhelmingly view conflict as negative and something to be avoided or resolved as soon as possible. However, there are many authors have pointed out conflict is a phenomenon that may give rise not only to functional but also dysfunctional effects on individuals, groups and organizations. As today‘s claims and disputes keep increasing, the construction industry struggles to find ways to equitably and economically to resolve them. According to Shin, managing disputes should become a part of normal project management during project operation because disputes in construction projects are common place and the resolution need to occur immediately on the project site.

Brown et alhighlighted that conflict is doubt or questioning, opposition, incompatible behavior, controversy or antagonistic interaction and disputes is one of the range of events considered as conflict. According to Kumaraswamy&Yogeswaran, a dispute can be said to exist when a claim or assertion made is made by one party is rejected by the other party and that rejection is not accepted.‖ This shows that disputes is more likely occur when the conflicting parties shows an action or arguments to a controversy. Referring to Vorster, a dispute is defined as an argument about an issue concerning project operations, usually resulting from a debate over differences in two or more parties‘ understanding of situation.This statement is supported by another statement by Deutsch that defines conflict as incompatible activities; conflict occurs when the behavior of one person is interfering or obstructing the actions of another. There are perhaps as many definitions of conflict as there are occasions for its occurrence. According to Thomas there are three themes among the definitions of conflict. The first is that whether conflict exists or not is a perception issue.

The perceived difference may not be real but conversely if the difference is real but not perceived there is no conflict. The second common theme is that there is interdependence among parties (i.e. each has the potential to interfere with the other). Third, there are issues of blockage, opposition, and scarcity. Resources, for example, money, power and prestige, arelimited. Their scarcity creates blocking behavior. When one party blocks the means to a goal or interest of another, a state of conflict exists. These numerous definitions show that scholars are looking at conflict from different angles but are there a difference between conflict and dispute and if so, should we concern ourselves with the difference? Some authors do not differentiate as Moore manages to mix the two terms in the first paragraph of his Chapter 1. However, most of previous research defines conflict and disputes shares the same definition that is generally involves disagreement regarding interests or ideas and that was adopted for this research. The important issue is both of the terms has historically been viewed as undesirable, something to be avoided.

1.2   Statement of the problem

No matter how strategic you are in attempting to resolve a difference of opinion with another person, as long as it is framed as a conflict and viewed by at least one of you in terms of one person being “right” and the other as “wrong” no real progress is made in the relationship. A battle will be won, but a war will rage on. The presence of right/wrong dynamics in a relationship indicates a power struggle and not the process of co-creation by two equally respected partners. Whether deciding what to have for dinner, when and how to express shared intimacy or any other decision that affects both partners, ultimately it is the decision making process rather than the decision itself that speaks volumes about the quality of consciousness being expressed in the relationship.

1.3   Significance of the study

Conflict occurs inevitably, but preparing to deal with it in a rational, positive manner can save you from further disruption. Conflict occurs when people have different opinions, lack respect for each other or simply misunderstand intentions. Resolving conflict involves communicating effectively and reaching a compromise. Ignoring dissension eventually takes its toll both mentally and physically. Positive conflict resolution in a team results in better long-term team dynamics. This paper significantly overview the conflict resolution in construction industry which is hoped to give clearer scenario to all project teams. Conflict would arise due to behavioral problems such as poor communication among project team, multicultural team problem and reluctant to check for constructability, clarity and completeness of project. Besides that, conflict also arises due to the factors of contractual problem which includes delay interim payment from client, client fails to respond in timely manner, application of extension of time and improper project schedules. Other than that, contractor’s quality of work, error of pricing or costing, late instructions from architect or engineer also considered as the factors of conflict which is due to technical problems. This paper was hoped to be a useful reference to the project team in managing conflicts for future construction projects.

1.4   Objectives of the study

1. To know if conflicts can be resolved in Nigerian construction industries.

2. To ascertain the relationship between conflict resolution and construction industries in Nigeria

1.5   Research questions

1. Can conflicts be resolved in Nigerian construction industries?

2. What relationship exists between conflict resolution and construction industries in Nigeria?

1.6   Research hypotheses

Ho: Conflicts cannot be resolved in Nigerian construction industries.

Hi:Conflicts can be resolved in Nigerian construction industries.

Ho: There is no significant relationship between conflict resolution and construction industriesin Nigeria.

Hi: There is a significant relationship between conflict resolution and construction industriesin Nigeria.

1.7   Limitations of the study

The study was with constrained, some of these constraints are:

1. Finance: It was no doubt a great limited factor for this project considering the worldwide economic recession and the particular financial squeeze within the country. All these combined together or bear on me.

2. Time Limit: There is also limited amount of time in the course of investigation. This is based on the fact that the researcher will have other task to perform, these includesassignments in the school, going for lectures, preparation for test, examination and others to mention but a few. Based on these the project covers those areas that are very crucial to the problems under investigation.

1.8   Scope of the study

The study is restricted to conflict resolution in Nigerian construction industries; from project managers’ view. Julius Berger was used as the case study for this research.

1.9   Definition of terms

ConflictResolution:Is the process by which two or more parties engaged in a disagreement, dispute or debate to reach an agreement resolving it.

Construction Industry:The branch of manufacture and trade based on the building, maintaining, and repairing structures.

Project Manager:The person in overall charge of the planning and execution of a particular project.

REFERENCES

McManamy, R. (1994). Indusrty pounds away at disputes. Engineering news record, 24,3.

Whitfield, J. (1994). Conflicts in construction, avoiding, managing and resolving.London: Macmillan Press.

Kumaraswamy, M., &Yogeswaran, K. (1998). Significant souces of construction claims. International Construction Law Review, 15 (1), 144-160.

Kathleen, M. J. H. (2003). Conflicts between Owner and Contractors : Proposed Intervention Process. Journal of Management in Engineering, ASCE (July 2003),121-124.

Smith, M. (1992).Facing up to conflict in construction. Paper presented at the First international conference on construction conflict: management and resolution, Manchester.

Hackman, J. R., & Morris, C. G. (1975). Group task, group interaction process, and group performance effectiveness: a review and proposed integration (Vol. 8). San Diego, CA: Academic Press.

Cheung, S. O., &Suen, C. H. (2002).A multi-attribute utility model for disputes resolution strategy selection Construction Management Economy, 20, 557-568. [9] Pondy, L. R. (1967). Organizational conflict. Administrative Science Quarterly, 12(2), 296-320.

Arditi, D., &Pulket, T. (2005).Predicting the outcome of construction litigation using boosted decision trees.Journal of Computing In Civil Engineering © ASCE, 387-393.

Shin, K.-C.K. (2000).Identification of critical disputes characteristic (cdcs) during construction project operations.Georgia Institute of Technology, Georgia.

Brown, H., & A., M. (1993).ADR Principles and Practice. London: Sweet and Maxwell.

Vorster, M. C. (19

  DOWNLOAD THE COMPLETE PROJECT

CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!