Select Currency
Translate this page

APPRAISAL OF MATERIALS HANDLING MANAGEMENT IN MANUFACTURING FIRMS IN NIGERIA

Format: MS WORD  |  Chapter: 1-5  |  Pages: 64  |  853 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

APPRAISAL OF MATERIALS HANDLING MANAGEMENT IN MANUFACTURING FIRMS IN NIGERIA

 

CHAPTER ONE

1.0 INTRODCUTION

1.1 BACKGROUND TO THE STUDY

The need for effective and efficient inventory control. Recent advancement and technology in business activities have generated the need for inventory management and control. For more than a decade now, inventories were handled by a clerk in a routine manner without applying the techniques of inventory but in a recent time, proper attention has been given to inventory management and control. In the effect of inventory control adequate care is taken in the assessment of the items cum materials to be hold in stock, decide the extent of stock holding of items individually and finally regulating the input and issue of stock into and from store cum warehouses. Any management that neglects inventory control will definitely run into costs that will generally reduce its corporate profit. Shortages in inventory will interrupt production and will further lead to losses. On the other hand if there is unintentional excess of stocking of materials in inventories, the organization’s funds will be tied up in stock instead of using it for profitable purposes. It is of these fact that any organization will decide on how much and how often to place order in order to minimize the cost involved and equilibrate the total cost resulting from excess stocking and under stocking. Therefore the importance of the effect of inventory control in the modern enterprises cannot be over emphasized.

The brief history of ABC transport, associated bus company limited operation of ABC transport commenced operation in road passenger transportation on February 1st 1993, as an off-shoot of rapid identities with a view to running a model road transportation system in Nigeria. In March 2003, capital alliance private equity (GAPE) acquire 30% shares of ABC transport with the acquisition, capital alliance (Nigeria) because stake holders in ABC transport, a partnership that repositioned the company for greater performance. ABC Transport Operates luxury bus services according to transportation, its services are specially designed for distinguishing. Evers who would otherwise use our services. The operations within Nigeria is carried out in ultra modern terminals with considerable languages in various cities like Lagos (Jibpwu and Estac), Aba, Owerri, Port-Harcourt, Abuja, Enugu, Okene, Onithsa and Umuahia etc. ABC buses are double with the company’s trademark the reindeer. The choice of the render as the company’s trademark. Symbol was made after a careful study for peculiarities of the animal, which is strong fast and moves in hard. For the company’s trademark achievement in transportation, ABC transport was adjudged the best transporters in Nigeria by the chartered institute of transport Nigeria and has since their consistently won the national bus operator of the year award along with other accolade s by renowned bodies.

1.2 STATEMENT OF THE PROBLEMS

Most organizations do not realize the essence of importance of maintaining an efficient and need for inventory control mechanism and because of this, many of these organizations cannot find their feet in business. Some of the factors that contributed to their inability to find their feet in business also include, lack of proper inventory of loads, tieing of capital, loss through obsolescence and deterioration. At the same time, shortages of materials have arises at the time when they are urgently needed and with this operators are delayed. It is based with the effect of inventory control of the modern enterprises even as it applies to the ABC transport and also profer solutions through this work.

1.3 OBJECTIVES OF THE STUDY

Inventories are stock of finished goods and raw materials kept for strategic reasons by organization. Inventory are necessary to run the organization more efficiently by keeping the operation at a fair level, rate and maintain optimum stock levels. The objectives include determine the following; who makes inventory decision in the ABC transport? If the systems in use in the ABC transport are working in line with the organizations goal? And where this is not the case, to help suggest ways of improving on their performances, this study will help the ABC transport to recognize the problems invent in the management and control of inventories in the organization and on how to solve the problems.

1.4 RESEARCH QUESTIONS 

The following research questions will be used for the project.

(a) Does ABC transport patronage reduce risk of transport adulterated passengers.

(b) Does the ABC transport provide variables than general company.

1.5 SIGNIFICANCE OF THE STUDY

This study will be of benefit to the following persons or group of persons:

(a) The Government: The government will be able to know how resources are being managed and controlled in the modern enterprise. 

(b) The Modern Enterprise: The modern enterprises will be able to identify areas to intensify the effect of inventory control measures.

(c) The Management; They will be in position to access if the inventory target or goals of the organization are being achieved.

(d) The Researcher: Any researcher who may so desire to carry out further research on the topic or related topic.

1.6 SCOPE OF THE STUDY

The researcher concentrated this work in the ABC transport due to the problems which are encountered in the course of studying numerous organizations as it regard to finance. Thus, this study is limited within the continues of the operations of the ABC transport.

1.7 LIMITATION OF THE STUDY

Even though this work is limited ti the ABC transport, the researcher still encountered some problems and constraints in the case of this work which includes:

Finance: Lack of finance limited the areas which the researcher should have covered in the course of this study.

Time: This is also a constraint since the researcher could not wait or schedule appointment of the appropriate staff is to produce the relevant data due to limited time.

Lack of relevant textbooks: This also formed a limitation because most textbooks are outdated and were not able to treat the topic in its totality and also coupled with our poor library system.

1.8 DEFINITION OF TERMS

Inventory/stock is an idle resource of any kind that posses economic value:

Inventory control: Is a managerial technique that tries to maintain enough stock to meet reasonable fluctuation in demand.

Inventory control system: Is an operational system designed to provide maximum inventory service to inventory users at a minimum cost to the organization’s management.

Inventory Management: Is a managerial responsibility that determined and fixes the appropriate level of inventory of an organization.

Inventory policy: Is a plan of action on a statement of ideals adopted by an organization that guide the operation of the inventory manager.

Lead/procurement time: Is the time internal between the placement and the receipt of an order.

Ordering time: Is the period inventory level at which the ordered for replenishment of stock.

Re-order point level: Is the inventory at which the order must be made.

Re-order quantity: Is the number of inventory unit that is to be ordered at a point in time.

Purchase cost: Is the period costs incurred in the placement of orders.

Material requirement planning (MRP): The approach that calculates production materials requirement weekly/several operating periods in advantages of the actual need.

ABC analysis: It is a managerial technique that is developed for classifying inventory items in their order of importance.

Inventory holding cost: Is the cost incurred due to capital inventory items being tied up in stock.

Economic order quantity (EOQ): The size quantity of order that minimizes the total inventory costs.

Cyclical ordering system: Is a system of inventory management used when the stock level of a given unit us not sufficient until the next schedule review an order is placed replenishing the supply.

Shortage cost: Is the cost incurred when an organization runs out of materials.

Stock Our: Is a term used in the situation whereby an organization runs out of material of a particular inventory.

Inventory deterministic model; Is a basic technique used in arriving at the economic order quantity under condition of certainty.

Pilferage cost: Is the cost incurred due to inventory keepers/workers stealing inventory items from the stock there by reducing the inventory level.

Purchase question: Is a prepared booklet used by the stock control unit when new quantities of times should be ordered next.

Physical inventories: Is used to certify balances whom on the perpetual inventory records and to obtain a correct on all items of inventory that may be on a control.

Inventory Evaluation: Is when management complies inventory evaluation in order to make inventory level decision and to provide data for financial reports to internal and external parties.

Specific identification: Is a method of inventory evaluation which items of stock specifically identify by particular attributes are assigned value which have already been known.

  DOWNLOAD THE COMPLETE PROJECT

APPRAISAL OF MATERIALS HANDLING MANAGEMENT IN MANUFACTURING FIRMS IN NIGERIA

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON APPRAISAL OF MATERIALS HANDLING MANAGEMENT IN MANUFACTURING FIRMS IN NIGERIA INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on APPRAISAL OF MATERIALS HANDLING MANAGEMENT IN MANUFACTURING FIRMS IN NIGERIA?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on APPRAISAL OF MATERIALS HANDLING MANAGEMENT IN MANUFACTURING FIRMS IN NIGERIA?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for APPRAISAL OF MATERIALS HANDLING MANAGEMENT IN MANUFACTURING FIRMS IN NIGERIA, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!