Select Currency
Translate this page

ANALYSIS OF FACTORS RESPONSIBLE FOR LOW PRODUCTIVITY OF THE NIGERIAN WORKERS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 53  |  899 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ANALYSIS OF FACTORS RESPONSIBLE FOR LOW PRODUCTIVITY OF THE NIGERIAN WORKERS (A CASE STUDY OF NEPA ENUGU ZONAL OFFICE)

 

ABSTRACT

Branch (1975) was of the view that productivity means the continuing improvement of the firm management performance in the use of resources and though the operations it is conducted.  However the purpose of this work highligts those factors responsible for low productivity among Nigerian workers. The research tends to focus on those means that will be applied to get workers committed to tier work using effective national tool to enhance and increase productivity level of the public organization, Nepa Enugu zonal office as the study scope.  Data were collected from both primary and secondary sources, the analysis and secondary sources, the analysis of the research brought out a population size used to determine the basis for the information gathered and analyzed. The use of percentage % helped to further the test o the data analyzed.  The findings of the research observed by the help of questionnaires and interviews embarked upon as the factors responsible for the low productivity of Nigeria workers.

 

CHAPTER ONE

INTRODUCTION

BACKGROUND OF THE STUDY

Production both private and public organization is simply the Interrelationship between input and output. Inputs are resources such as labour materials and work done products distributed or services rendered. In Nigeria, works have been exercising some or certain problems that have been militating against productivity level which has completely affected the gross domestic product of the nation The government is trying to see that productivity maintains an impressive level, the ministry of labour and productivity.  National productivity center etc.  are doing everything to alleviate the problems of low productivity of the Nigeria workers. In view of these one may ask why the Nigerian worker is still faced with the problem of low productivity, inspire of all the government efforts to improve productivity. Briefly we take short history of NEPA which is a service organization in viewing the general Nigeria workers. Electricity development in Nigeria started towards the end of the 19th century, when the first generating plant was installed in the city of Lagos in 1898. Later, other electricity undertakings were set up by the native and municipal authorities in different part of the country.   In 1950, in order to integrate power development in the country and make it effective, the federal government passed the electricity corporation of Nigeria ordinance No.15 of 1950.  This ordinance brought under one umbrella all the electricity undertakings owned and controlled by the native and municipal authorities under the public works department

The electricity corporation of Nigeria (ECN) became the statutory body responsible for generating transmitting, distributing and sales of electricity to all customers in Nigeria. By Decree No.24 of 27th June, 1972, the electricity corporation of Nigeria (ECN) and Niger Dams Authority (NDA) were merged by the Federal Government to become the National Electricity Power Authority.  Power generation in Nigeria started with a humble but steady beginning with only the Ijors, Delta, Egbin, sapele, Afan thermel power stations, Kainji Jebba and Shiroro Hydro power station, with the generation capacity increased from 20mw to over 6,000mw in the year 2002

STATEMENT OF THE PROBLEM

Research has been carried out in Nigeria; regrettably not much has been done in the way of solving the problem facing the Nigeria workers. This has been detrimental to the increase of productivity which will contribute to the development of nation like Nigeria. In order to increase productivity among the workers in Nigeria with athe help of NEPA as a guide the following bottle neck were observed. The fear of Job security among workers. The workers should be assumed of their jobs. The motivational tool and incentives were not properly provided to the workers that will make them to put in their best. The job evaluation system has been carried out in an unfair manner Lack of programmes provision for developing staff made many junior staff undertake personal training at the detriment of the employers.

  DOWNLOAD THE COMPLETE PROJECT

ANALYSIS OF FACTORS RESPONSIBLE FOR LOW PRODUCTIVITY OF THE NIGERIAN WORKERS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON ANALYSIS OF FACTORS RESPONSIBLE FOR LOW PRODUCTIVITY OF THE NIGERIAN WORKERS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on ANALYSIS OF FACTORS RESPONSIBLE FOR LOW PRODUCTIVITY OF THE NIGERIAN WORKERS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on ANALYSIS OF FACTORS RESPONSIBLE FOR LOW PRODUCTIVITY OF THE NIGERIAN WORKERS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for ANALYSIS OF FACTORS RESPONSIBLE FOR LOW PRODUCTIVITY OF THE NIGERIAN WORKERS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!