Select Currency
Translate this page

THE EFFECT OF GROUNDWATER CONTAMINATION

Format: MS WORD  |  Chapter: 1-5  |  Pages: 71  |  2425 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

THE EFFECT OF GROUNDWATER CONTAMINATION

 

ABSTRACT

In Nigeria, inadequate supply of pipe borne water is a major concern; hence many homes have wells as a source of water for household uses. The groundwater of forty wells in Agbowo community was assessed for Total Aerobic Bacteria Counts (TABC) and Total Coliform Counts (TCC). The location and distances of wells from septic tanks were determine dusing the Global Positioning System (GPS) device and a tape rule respectively. All the wells sampled had high TABC(4.76±1.41 log CFU/mL) and TCC (2.29±0.67 log CFU/mL) counts which exceeded the international standard of 0 per100 mL of potable water. There were no significant differences in the bacterial counts between covered and uncoveredwells (p >0.05). The mean distance (8.93±3.61m) of wells from the septic tanks was below the limit (15.24 m or 50 ft) setby United State Environmental Protection Agency (USEPA). TABC increased with a decrease in distance between thewells and septic tanks though not significant (p <0.05)A very weak positive correlation (r2=0.021)ensued between thedistance from septic tank and CC, while a weak negative correlation (r2=‒0.261)  was obtained between the TCC andTABC. This study accentuates the need to set standards for the siting of wells from septic tanks while considering allpossible sources of well contamination as well as treatment of ground water before use.

  DOWNLOAD THE COMPLETE PROJECT

THE EFFECT OF GROUNDWATER CONTAMINATION

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON THE EFFECT OF GROUNDWATER CONTAMINATION INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on THE EFFECT OF GROUNDWATER CONTAMINATION?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on THE EFFECT OF GROUNDWATER CONTAMINATION?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for THE EFFECT OF GROUNDWATER CONTAMINATION, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!