Select Currency
Translate this page

EVALUATION OF STOCK AND CONTROL SYSTEM

Format: MS WORD  |  Chapter: 1-5  |  Pages: 70  |  1183 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

EVALUATION OF STOCK AND CONTROL SYSTEM 

 

CHAPTER ONE

1.1   INTRODUCTION

Stock can be defined as goods available for sale, distribution or use and goods kept by a trader or shopkeeper. There are varieties of inventories existing in a manufacturing company. The inventory includes:

·  Raw materials

·  Work in progress

·  Finished goods

According to Omolehinwa (1985) raw materials is defined as the items of materials that have not been processed at all by the relevant manufacturing department but will be used later as part of the inputs for the output of the firm.

John Nwafa (2005) says that what is raw materials to one company or organisation may be a finished product to another organisation. Work-in-process, also know as work-in-process are the items for which work has started, in the manufacturing process but not yet completed for sale. It is valued by adding the cost of raw materials consume so far with the labour cost and other manufacturing cost incurred on the items semi-process (known as overhead expenses) up to the end of the accounting period.

While finished goods are manufactured goods or are manufacturing good completed and being held for safe, they are valued by adding up the direct material and direct labour consumed and the overhead cost adsorbed by the finished units still to be sold.

Formally called materials control, the stock control history dated back to the 18thcentury’s industrial revolution are in Europe. At the nascent stage, the benefits of stock control and valuation procedures was not greatly appreciated because most of the industries were just beginning to develop industrially. Hence, stock control system comes along with the expansion of manufacturing industries. And this was significantly enhanced by the awareness of production cost, reduction and profit maximization.

However, starting from the Second World War period, the importance of raw materials and work-in-progress on the production process was felt. This subsequently led to the discovery of various means by which improvement could be brought to stock control and valuation system. Thereby eventually increasing the production level of goods by reducing the production costs.

Therefore, various means of evaluating stock and control system are being used to improved the profit maximization objectives of industries.

1.2   PURPOSE OF THE STUDY

Apart from looking into the practice and application of stock control, the purpose of this research is to examine the relationship that exist between the profit planning objectives of Nigerian Breweries Plc and the present level of investment of the company’s investment in inventories. Furthermore, it is to determine if there is another level of stocks at which profit can be maximised.

1.3   PROBLEM ANALYSIS

It is no gain saying that most of the industrial concerns in the country, the brewing section inclusive, are faced with many problems. The problems range from lack of adequate raw materials, shortage of spare parts, through poor management of stocks, to obsolete and obsolescence’s. These bottlenecks usually result into production stoppages. In some cases, it often leads to temporary closure of plants.

Direct materials do account for over 50 percent of total product cost in must companies. And stock maintenance cost can amount to about 25 percent of the value of stock. According to a business asciom “the customers is a king”. He should be made to feel so. Equally the employees should be well-motivated. Hence, their needs should be considered.

1.4    RESEARCH QUESTIONS

The questions to which answers are being sought are:

·  Is there any shortage of raw materials

·  Is the company operating at it full capacity or below capacity, if below, then at what capacity?

·  What is the impact of shortage of over stocking on profit of Nigerian Breweries Plc

·  How does the volume of production affect the selling price?

1.5  JUSTIFICATION OF STUDY 

The importance of evaluation of stocks and control system in any developing country, like Nigeria, cannot be overemphasized. Stock being the beginning of production activities in manufacturing organisation in general and Nigeria Breweries Plc in particular would be analysed. Recommendation would also be given to enable Nigerian Breweries Plc to more profit. Hence, contributing more to the Gross National Product (GND) of the country.

1.6  LIMITATION OF THE STUDY

The research will be limited to areas that relates to stock within Nigeria Breweries Plc, Iganmu. This would include the following department:

·  Purchasing department

·  Stores department

·  Production department

·  Sales department

1.7  SCOPE OF THE STUDY

Brewing companies in Nigeria are many. Most states in the country are having at least two brewing concerns. And each company having its peculiar problems. The peculiarity of some of the problems not withstanding, the breaking companies faces similar problems.

Albeit, extending this research work to all the brewing companies in Nigeria is unadvised. The inhabitation being the cost (finance) time and the extend of coverage of each an undertaking. Hence, the research work is limited to a case study of Nigerian Breweries Plc.

The Nigerian Breweries Plc has a rich portfolio of high quality brands. Star Lager Beer (1949): Gulder Lager  Beer (1970); Maltina (1976) now has three varies (Maltina Classic, Maltina Strawberry , and Maltina with Pineapple) as well as Maltina  sip-it, packaged in tetrapaks, launched in 2005. Legent Extra stout (1992): Amstel Malta (1994). Heineken Layer was re-launched into the Nigerian market june 1998. Gulder man and Fayrouz were introduced in 2006.

Nigerian Breweries Plc has an increase export business that also back to 1986. Currently, the company exports to the U.K., Europe and the West African sub-region. And the topic of this study evaluation of stocks and control system is addressed from stories routine, stock taking, cost and cost accounting prospective.

1.8  CONTRIBUTION OF THE STUDY

Shortage of raw materials and lack of effective stock control often result into production stoppages and company closures. Not only that, it may also result into workers lay-offs. The subject matter of this study will no doubt add to the ideas pool on stocks evaluation and control system in relation to the Nigeria Breweries Plc.

Again the study is going to be useful to other companies as well. They can compare the operative since their stores and purchasing department with this (research) approach, procedures and techniques contained in this study. Hence, the issue of shortage of raw materials, lack of spare parts and stock out can be minimized.

1.9  DEFINITION OF TERMS

Stock:  Goods available for sales, distribution or use, and goods kept by a trader in shop keeper.

Stock Control: The process of regulating the stocks of operating business. It is concerned with keeping of records and stocks within acceptable limits.

Stock-Out-Cost:  The cost of not meeting the production demands. This can lead to loss of customer’s goodwill and reduced profit.

Maximum Stock Level: This is maximum stock level of stock which the management must not allow the stock level to rise above. It is an indication to management to show that the stock is rising high; any stock above the maximum level may affect the cost of production in form of storage and security cost.

Minimum Stock Level: This is the stock level which the management must not allow the stock in the warehouses to fall below, if the stock level fall below the minimum level, there is possibility of shortage of supplies which may affect production.

Re-Order Level:  This is the level when new orders will be place for material. The reorder is in between the minimum level and the maximum level.

Re-Order Quantity:    This is often called the economic order quantity (E.O.Q). It is the quantity where the management will try to minimize re-ordering cost and storage/carrying cost.

Waste:    Discarded materials that has not recovery value.

Scrap: Discarded materials having some recovering values.

Obsolescent:    Materials which are becoming out of decte or passing out of use.

Full Capacity: This is when the level of activities of volume of production equal to total installed capacity of the plant. A stage at which the manufacture starts considering the issue of plant expansion, depending on other market variable.

 

REFERENCES

Omolehinwa, Eddy O. (1985) Fundamental of Costs Accounting. Nigeria Ayo Sodimu Publishers.

Mr. John Nwafa (2005): Cost Accounting Lecturer, Yaba College of Technology, Yaba, Lagos.

  DOWNLOAD THE COMPLETE PROJECT

EVALUATION OF STOCK AND CONTROL SYSTEM

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EVALUATION OF STOCK AND CONTROL SYSTEM INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Uduak From Uniuyo
IProjectMaster is the best project site for students. Their works are unique and free of plagiarism!
Excellent
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EVALUATION OF STOCK AND CONTROL SYSTEM?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EVALUATION OF STOCK AND CONTROL SYSTEM?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EVALUATION OF STOCK AND CONTROL SYSTEM, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!