Select Currency
Translate this page

DESIGN AND IMPLEMENTATION OF WEB-BASE PUBLIC PRIVATE PARTNERSHIP

Format: MS WORD  |  Chapter: 1-5  |  Pages: 66  |  853 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

ABSTRACT

Public private partnership (PPPs) is a form of cooperation between the public and private sectors. Its goals are to finance, build (reconstruction), operation and maintenance of the infrastructure and to provide public service through the infrastructure. Within the PPPs entities of public sector are partner and customers of the private sector from which the purchase services. In principle the private partner finances, builds, and operate the infrastructure and is enabled to provide respective service compensated by payment from the end-user (concession) or from the public partner. The substantial attribute of public private partnerships is the sharing of risks relating to build and operation of the infrastructure between the private and public partner and a long time contract. Regarding the fact that public private partnership projects are robust and have a significant impact on the public administration budget. The ministry of finance regulates their preparation and facilitates public authorities to prepare their public private partnership projects according to their best international practice.         

 

CHAPTER ONE

1.0 INTRODUCTION

Public Private Partnership (PPPS) is a means of using private finance and skills to deliver capital investment projects traditionally provided by the public sector. These include capital projects such as schools, hospitals, roads, and water facilities. Instead of the public body directly procuring capital assets and subsequently owning, operating, and regulating them. Public private partnerships (ppps) generally involve the private sector owning and operating, but the public sector buying the services from the contractor for a fixed period of time. A public body enters into a contract with a private sector consortium to deliver the project. Part of the contract specifies that the private consortium must take on a considerable degree of the risk associated with the project. Risks include possible cost over runs, lower than expected usage, and so forth. The public sector body contracts with the private consortium to deliver some or all of the services associated with the investment over a number of years.

Electronic computer have outpaced man in the area of the speed with which the retrieve information, process it, and communicate the results. The capacity to store vast quantities of information, retrieve the information when needs arises for it are some of the main reason of the computer (web base). The computer complements the work of human system, which would have been much burden to him; it could be safe to say that computer is an extension of human brain. Therefore, by definition, computer is an electrical/ electronic device which accepts input in the form of data and uses a pre-defined instruction known as computer program, in order to produce a desirable output. There is need for computers where there is massive data handling and additional record to make less harmful against quick retrieval of essential information keeping historical records and operational data in small which could be retrieved in short time. Many organization at the moment are using computers to save time, money, and improve service reduce monotonous routine work. The research is on imo state budgeting office. Budget is an annual government statement of a country income from taxes and how it will be spent.

1.1 BACKGROUND OF THE STUDY

Budget office can best be described as an institution that are responsible for the amount of money needed or provided for a specific purpose, and statement of a country income from taxes for the government. Therefore government establishes a board for each state, a board to be known as the state board of budget office in the state whose operation aim shall be known as the state budget office services.

BRIEF HISTORY OF BOARD OF IMO STATE BUDGET OFFICE

The board was called bureau for budget and planning during the military administration headed by a Director-General Mr. Ekwe. It was later changed to imo state planning and economic development commission. In 2009 it was changed to ministry of planning, it was headed by a commissioner Dr.(mrs) Ngozi Anyikwe.  The ministry has about five department, including three technical department namely; recurrent budget, macro planning, statistics department. The other two are administration, and accounting department. The permanent secretary is Mr. Calitus Ekenze

  DOWNLOAD THE COMPLETE PROJECT

DESIGN AND IMPLEMENTATION OF WEB-BASE PUBLIC PRIVATE PARTNERSHIP

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON DESIGN AND IMPLEMENTATION OF WEB-BASE PUBLIC PRIVATE PARTNERSHIP INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Peace From Unilag
I cried not knowing how to go about my project but the day i searched online and saw iprojectmaster, i called and got my full project in less than 15minutes, i was shocked!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abdul Mateen Iddrisu
UDS
At first I taught is a site full of fraudsters until I saw my project in my Gmail after my payment.. THANK YOU IPROJECTMASTER and May God the almighty bless u guys abundantly
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on DESIGN AND IMPLEMENTATION OF WEB-BASE PUBLIC PRIVATE PARTNERSHIP?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on DESIGN AND IMPLEMENTATION OF WEB-BASE PUBLIC PRIVATE PARTNERSHIP?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for DESIGN AND IMPLEMENTATION OF WEB-BASE PUBLIC PRIVATE PARTNERSHIP, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!