Select Currency
Translate this page

CEMENT DELIVERY RECORD SYSTEM

Format: MS WORD  |  Chapter: 1-5  |  Pages: 65  |  914 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

CEMENT DELIVERY RECORD SYSTEM

 

CHAPTER ONE

INTRODUCTION

1.0 Introduction

Delivery is the act through which goods produced are transferred from the production area to the final consumer through different channels. It ensure that people will be able to obtain production when and where needed; it involves the actual movement of product as well as their ownership. To the ultimate consumers processing of any Nigeria company especially Dangote Cement help save difficulties encountered during the delivery of the final product.

The general process of cement delivery is one of the four elements of marketing.

1.1 Theoretical Background

Dangote Cement plc founded 1992 is a publicly traded cement manufacturer headquartered  in Lagos Nigeria. The company is engaged in the manufacturing, preparing, exporting, packaging and delivery of cement and related products in Nigeria, west, east and South Africa.

Dangote Cement plc was formally known as “Obajana Cement plc” in July 2010. Obajana Cement plc was incorporated in 1992. Dangote is a subsidiary of Dangote Industries limited and is the largest company traded on Nigeria Stock exchange with three cement plant in: Kogii State, Ibese in Ogun state and Benue State.

1.2 Statement of the Problem

The following are the problems encountered in the existing system:

Difficulties in keeping record of cement delivery. Inability to quickly retrieve reports pertaining to cement delivery. It is difficult to update cement delivery record Errors in record keeping due to missing information pertaining cement delivery. Manual method of record keeping is tedious.

1.3 Aim and Objectives of the Study

The aim of this research work is design and implementation of a cement delivery record system for Dangote Company distributor with the following objectives:

To develop a system that will aid management of cement delivery records. To create a system that will aid management of cement delivery records. To create a system that will aid in the search/update of cement delivery record. To develop a system that will aid querying of the database record by date of delivery or purchase.

1.4 Significance of the Study

Provide benefit in controlling cost and meeting customer services demands. Offset the cost of inventory control, which could be much more costly. It serves as an information bank. It benefit in securing financial transaction information of the company.

1.5 Scope of the Study

The scope of the research work is on cement delivery record system. The program focuses on the delivery record system of a cement using computer system. The study uses Dangote Cement plc  Distrubutor Ikot Ekpene  as its case study. dangote is the major producer and deliverer of cement and other products and the delivery is being carried out in large quantities.

1.6 Organization of the Research

This research work is organized into five chapters.

Chapter one gives a general introduction, theoretical background, statement of the problem, aim and objectives of the study, significance of the study, scope of the study, organization of the research and definition of terms.

Chapter two gives the introduction and literature review of the research.

Chapter three deals with system analysis and design which handle introduction, , research methodology , system analysis, analysis of the existing system , analysis of the proposed system, advantages of the proposed system, disadvantages of the proposed system, system design, input layout, program flowchart and output format.

Chapter four is the system implementation and documentation which handles introduction, system design diagram, choice of programming language, analysis of modules, programming environment, hardware requirements, software requirements, implementation.

Chapter five deals with introduction, constraints of the study, summary, conclusion and recommendations are provided in this chapter based on the study carried out.

1.7 Definition of Terms

Cement: This is a powdered material which develops strong adhesive qualities when combined with water which is used in building and all construction works.

Production: Production refers to the process of combining natural or raw materials to form a particular product which could be used in making other things for consumption.

Delivery: This refers to the process of taking the finished product to various locations for it to reach the consumers. It system by whuch products are transferred from the production area to the final consumer through different channels. Delivery started when the idea of producing goods come up, if goods are produced without being sold, it becomes a waste of time, money, resources.

Inventory: Inventory is the process of keeping record of everything that is going on in the company.

Truck: This is an open railway vehicle for carrying goods to different locations.

Plants: It is a factory or place where goods are produced or an industrial process takes place.

Record: A set of related fields in a table that provide information about an entity.

Unit Price: The selling price of one unit of product.

  DOWNLOAD THE COMPLETE PROJECT

CEMENT DELIVERY RECORD SYSTEM

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON CEMENT DELIVERY RECORD SYSTEM INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Ibrahim Muhammad Muhammad
Usmanu danfodiyo university, sokoto
It's a site that give researcher student's to gain access work,easier,affordable and understandable. I appreciate the iproject master teams for making my project work fast and available .I will surely,recommend this site to my friends.thanks a lot..!
Excellent
Merry From BSU
I am now a graduate because of iprojectmaster.com, God Bless you guys for me.
Excellent
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Samuel From Ajayi Crowther University
You guys just made life easier for students. Thanks alot iprojectmaster.com
Excellent
Abdulrahman Jibrin
Nti Abaji
Nice one work prompt delivery tanx
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on CEMENT DELIVERY RECORD SYSTEM?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on CEMENT DELIVERY RECORD SYSTEM?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for CEMENT DELIVERY RECORD SYSTEM, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!