Select Currency
Translate this page

FUEL DISTRIBUTION IN NIGERIA: PROBLEMS AND SOLUTIONS

Format: MS WORD  |  Chapter: 1-5  |  Pages: 67  |  1149 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

FUEL DISTRIBUTION IN NIGERIA: PROBLEMS AND SOLUTIONS

 

ABSTRACT

The research seek to study fuel distribution in Nigeria: Problems and solutions. A case study of NNTE Enugu Depot. The major objective of the study is to determine solutions to fuel distribution problems. The study is generally descriptive. The major findings of the study are as follows:  Inadequate maintenance of pipelines  equipment and pumps lends to fuel shortages. Delivery of right quantity and quality of petroleum products to filling stations promoted effective supply of fuel. The conclusion drawn from this study is that, maintenance of pi0pelines equipment and pumps enhances fuel distribution. Equally, delivery of right quantity and quality of petroleum products to filling stations promotes effective supply of fuel. Based on the findings, it was recommended that government should make sure that the pipelines equipment and pumps are maintained and serviced  regularly to avoid fuel shortages. Finally, the independent oil marketers should always deliver the right quantity and quality of petroleum product to their filling stations to promotes affective supply of fuel.

CHAPTER ONE

INTRODUCTION

1.1  BACKGROUND TO THE STUDY

Initially, before the construction of refineries, petroleum used in Nigeria were imported by international oil marketers popularly known as big 8. They are total, Agip, Texaco, Unipetrol, African Petroleum (AP) National, Mobil and …petroleum. They import market petroleum product and also distribute them. But when refineries were built to produce local petroleum products  that will argument the imported ones, it later became necessary for government  to take over the importation of petroleum  products from oil marketers and thus the resultant setting up of pipeline and product marketing company (PPMC) and independent oil marketers in the early 80’s Nigerians who can afford to construct petrol stations were granted marketers licence by an agent of the federal government  (Dept. of petroleum resources) to join in the distribution of petroleum product in Nigeria under independent oil marketers status and ADONRI DAVID Vanguard control of national resources.

Today, the indigenous companies known as independent oil marketers are competing favourably with the big 8 in the distribution of petroleum products. That is because the operation of independent oil marketers cover across the linter lands of the Nigerian communities PPMC set by Nigerian government through the arm of NNPC  constructed depots and pipelines across the nation. Linking the depots and  refineries, depot to depot and refinery to refinery. Talking about petroleum product distribution in Nigeria by PPMC, we have three major means by which these products are distributed. The first one is through the pipeline running to the refineries to depots and from depot to depots. The second one is by tankers through the road and the last is through railways coaches.

1.2   STATEMENT OF PROBLEM

The researcher, seek to study fuel distribution in Nigeria problems and solutions. Generally, there has been the problem of fuel scarcity up-till now. This is because of uneven distribution of fuel in the country. Since the country had been experiencing fuel shortages, it is important to identify the problems encountered in the distribution of fuel and also to determine the possible solution to fuel scarcity said Mbagron 10, 2001, which he titled economic of resources control.

1.3   OBJECTIVES OF THE STUDY

The specific objectives of the study includes the following:

i)   To identify how fuel is distributed  by NNPC

ii)  To determine the problems encountered in fuel distribution

iii) To determine the causes(s) of fuel distribution problem

iv) To determine solutions to fuel distribution problems.

1.4   RESEARCH HYPOTHESIS

For the purpose of this study the following hypothesis have been formulated

Ho: Inadequate maintenance of pipelines equipment and pumps do not lead  to fuel shortages.

HI: Inadequate maintenance of pipelines equipment and pumps do not lead  to fuel shortages.

Ho: Delivery of right quantity and quality of petroleum products to filling stations do not promote effective supply of fuel

HI: Delivery of right quantity and quality of petroleum products to filling stations do not promote effective supply of fuel

1.5   SIGNIFICANCE OF THE SUTDY

The study of significance because it will serve as a source of vital information on fuel distribution. It will also serve as a reference for future research in the same field. It will also provide solution to fuel distribution problems.

1.6   SCOPE AND LIMITATIONS OF THE STUDY

The research is geared towards, fuel distribution in Nigeria. Problems and solution. A case study of NNPC  Enugu Depot. The main constraints of the study is divided into three points.

(a)  Time

(b)  Attitude of the respondents

(c)  Finance

Time:  Due to the limited time for the study the researcher could not travel to other places for more relevant information on the study.

Attitude of the respondents: The attitude of the respondents affected the research work because some of the respondents were unwilling to co-operate with the researcher because they felt that they have nothing to benefit from the study both financially and otherwise.

Finance: This is one of the most serious constraint the research encountered. A lot of money were required for the study to be carried out properly but however the researcher was handicapped financially.

REFERENCE

Campbell. Broos L.F. & PAYMENT P.B.W (1971) Exports and economic growth of developing countries, Syndica of the Cambridge university presently house, Eustin Road, London.

Otaiba, M.H (1975): Opee and the petroleum  industry, John Welly and sons Ltd, New York

Adori, D. Control of natural resources, (Vanguard January 31, 2001) P.29

Mbagwu, I Economics of resources (Daily champion January 2001) P. 25  

  DOWNLOAD THE COMPLETE PROJECT

FUEL DISTRIBUTION IN NIGERIA: PROBLEMS AND SOLUTIONS

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON FUEL DISTRIBUTION IN NIGERIA: PROBLEMS AND SOLUTIONS INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Musa From Ahmadu Bello University
Thank you iprojectmaster for saving my life, please keep it up and may God continue to bless you people.
Excellent
Abdulrazak Bello Marsha
Usman Dan fodio University
It was quite a better guide for project and paper presentation purpoting. Many thanks.
Average
Azeez Abiodun
Moshood Abiola polytechnic
I actually googled and saw about iproject master, copied the number and contacted them through WhatsApp to ask for the availability of the material and to my luck they have it. So there was a delay with the project due to the covid19 pandemic. I was really scared before making the payment cause I’ve been scammed twice, they attended so well to me and that made me trust the process and made the payment and provided them with proof, I got my material in less than 10minutes
Very Good
Gbadamosi Solomon Oluwabunmi
Lasu
Swift delivery within 9 minutes of payment. Thank you project master
Excellent
Adam Alhassan Yakubu
UDS
Excellent work and delivery , I promise to share my testimonies everyone in need of this kind of work. You're the best
Excellent
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on FUEL DISTRIBUTION IN NIGERIA: PROBLEMS AND SOLUTIONS?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on FUEL DISTRIBUTION IN NIGERIA: PROBLEMS AND SOLUTIONS?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for FUEL DISTRIBUTION IN NIGERIA: PROBLEMS AND SOLUTIONS, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!