Select Currency
Translate this page

EFFECT OF COVID-19 ON CONSTRUCTION SECTOR

Format: MS WORD  |  Chapter: 1-5  |  Pages: 79  |  2520 Users found this project useful  |  Price NGN5,000

  DOWNLOAD THE COMPLETE PROJECT

EFFECT OF COVID-19 ON CONSTRUCTION SECTOR

 

CHAPTER ONE

INTRODUCTION

1.0 BACKGROUND OF THE STUDY

The COVID-19 pandemic has devastated the world of works. Its impact, which varies across sectors, has been significant in the construction sector.The construction sector has an important role to play within the overall economy of any given country. How that role manifests itself will vary greatly from one nation to another, in developing countries it is likely that the extraction of raw materials and the on-site construction activity is of most importance, as the country seeks to set up a significant infrastructure, in the form of roads, railways and buildings.Construction sector activities include the construction, renovation, maintenance and demolition of buildings (residential and non-residential), as well as work conducted in civil engineering projects such as roads and utility systems(ILO 2015).A variety of market segments are involved, including architecture and design, equipment and material manufacture, transportation, and energy and waste management. Value is added by transforming source materials into capital assets essential both for economic activity and the delivery of infrastructure services. The construction sector has its significant impact on income generation and poverty reduction. Its significant job creation potential also comes from its labour-intensive nature and strong links with other economic sectors.In the first three months after COVID-19 emerged Wuhan City, Hubei Province, China, a devastating number of new cases were reported across China and several countries around the world. And it was finally declared as a global pandemic by the World Health Organization (WHO) on March 2020 (WHO 2020). Evidence indicates that COVID-19 transmitted through respiratory droplets via contact routes such as the mouth, nose, and conjunctiva or eyes (UNICEF 2020).However it was necessary for countries to effect total Lock downs of virtually every type of gathering place, stay-at-home measures instituted to combat the spread of the virus and at extreme pushing construction workers to leave their work site and abandoning important projects.

1.2 STATEMENT OF THE PROBLEM

At the outbreak of covid-19 pandemic, the entire world came to a standstill. This pandemic affected not only human health but also the operational health of businesses and organization, the construction industry inclusive. Professional bodies such as CIOB, RICS and the likes in an attempt to preserve “construction businesses” are rolling out strategies to enable smooth sailing and transition into the new dispensation. The “Roadmap to Recovery” prepared by Construction Leadership Council (CLC) requires the construction industry to ‘reinvent’ by safeguarding ‘construction businesses’ and work .In Nigeria the effects of the COVID-19 pandemic in relation to projects raised as a result of: (i) regulatory pronouncements by federal and state governments restricting movements, shutting business operations (including construction activities as in the case of Lagos State) and imposing health and safety measures to contain the spread of the virus such as requirements for social distancing and constraints on public gatherings; (ii) circulars by industry regulators such as the Department of Petroleum Resources (“DPR”) directing the demobilization of all non-essential staff at the offshore site and imposing health and safety measures to contain the spread of the virus at project and construction sites; (iii) disruptions to supply chain and stalled importation of construction equipment and material; (iv) escalation in the costs of construction due to inflation and currency fluctuation collaboratively as it restores (CIOB, 2020a). The Nigerian economy was negatively impacted especially in the country’s capital (Abuja) and financial centre (Lagos). However it is against this backdrop that this study seeks to examine the effect of covid-19 lock down on construction sector.

1.3 Objective of the study

The purpose of this study is to examine the effect of covid-19 lockdown on construction sector in Nigeria. Specifically this study seeks to find out if the covid-19 lock led to obstruction of work of construction sectors. The study also examine if construction sectors had access to raw materials for construction. The study also examine if there was reduction in revenue generation of construction sectors due to the covid-19 lock down.

1.4 Significance of the study

The study in its entirety would be helpful to the general body of knowledge.it would be helpful for the construction sector as this study would enable them to develop meaningful strategies that would enable combat challenges facing the sector during post-covid-19 era. Moreso it will enable professional bodies of leaders of construction sector on the need to organize training for their members in other to brace up to meet up with covid-19 safety guidelines. This study finally would give opportunity for furthers studies related to this the variables on discourse

1.5 Research Question

1. Did the covid-19 lock lead to obstruction of work of construction sectors?

2. Did construction sectors had access to raw materials for construction during the covid-19 lockdown?

3. Was there a reduction in revenue generation of construction sectors due to the covid-19 lock down?

1.6 Scope of the study

This study focus on examining the effect of covid-19 lockdown on construction sectors in Nigeria. The study is delimited to Geneks Nigeria Limited, Lagos State.

1.7 LIMITATION OF STUDY

Financial constraint– Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint– The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

However in the midst above mentioned limitation the researcher devotedly ensured that the purpose of the study was actualized.

1.8 Definition of Terms

COVID-19:Corona virus disease 2019 (COVID-19) is defined as illness caused by a novel corona virus called severe acute respiratory syndrome corona virus 2 (SARS-CoV-2.

Lockdown:A lockdown is a restriction policy for people or community to stay where they are, usually due to specific risks to themselves or to others if they can move and interact freely.

Construction: Construction is a general term meaning the art and science to form object and systems.construction covers the processes involved in delivering buildings, infrastructure and industrial facilities, and associated activities through to the end of their life

Construction Sector:construction sector as companies that are engaged in the construction of buildings or engineering projects, such as bridges and roads. Construction industry comprises of professional architect, builders,engineers and others

  DOWNLOAD THE COMPLETE PROJECT

EFFECT OF COVID-19 ON CONSTRUCTION SECTOR

Not The Topic You Are Looking For?



For Quick Help Chat with Us Now!

+234 813 292 6373

+233 55 397 8005


HOW TO GET THE COMPLETE PROJECT ON EFFECT OF COVID-19 ON CONSTRUCTION SECTOR INSTANTLY

  • Click on the Download Button above.
  • Select any option to get the complete project immediately.
  • Chat with Our Instant Help Desk on +234 813 292 6373 for further assistance.
  • All projects on our website are well researched by professionals with high level of professionalism.

Here's what our amazing customers are saying

Abraham Ogbanje
NATIONAL OPEN UNIVERSITY OF NIGERIA
At first I was afraid.. But I discovered they are legit. I will bring more patronize
Very Good
Emmanuel Essential
Kogi state University
I actually took the risk,you know first time stuff But i was suprised i received as requested. I love you guys 🌟 🌟 🌟 🌟
Very Good
Dau Mohammed Kabiru
Kaduna State College of Education Gidan Waya
This is my first time..Your service is superb. But because I was pressed for time, I became jittery when I did not receive feedbackd. I will do more business with you and I will recommend you to my friends. Thank you.
Very Good
Stancy M
Abia State University, Uturu
I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much iprojectmaster, infact, I owe my graduating well today to you guys...
Excellent
Oluchi From Michael Opara University
If you are a student and you have not used iprojectmaster materials, you are missing big time! iprojectmaster is the BEST
Excellent
MATTHEW NGBEDE
Ahmadu Bello University
I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!
Excellent
JONNAH EHIS
Ajayi Crowther University, Oyo
I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!
Excellent
Abubakar Iliyasu Hashim
Federal college of education pankshin affiliated to university of jos
I am highly impressed with your unquantifiable efforts for the leaners, more grace to your elbow.I will inform my colleagues about your website.
Very Good
Joseph M. Yohanna
Thanks a lot, am really grateful and will surely tell my friends about your website.
Excellent
Temitayo Ayodele
Obafemi Awolowo University
My friend told me about iprojectmaster website, I doubted her until I saw her download her full project instantly, I tried mine too and got it instantly, right now, am telling everyone in my school about iprojectmaster.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work
Very Good

FREQUENTLY ASKED QUESTIONS

How do I get this complete project on EFFECT OF COVID-19 ON CONSTRUCTION SECTOR?

Simply click on the Download button above and follow the procedure stated.

I have a fresh topic that is not on your website. How do I go about it?

How fast can I get this complete project on EFFECT OF COVID-19 ON CONSTRUCTION SECTOR?

Within 15 minutes if you want this exact project topic without adjustment

Is it a complete research project or just materials?

It is a Complete Research Project i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data

What if I want to change the case study for EFFECT OF COVID-19 ON CONSTRUCTION SECTOR, What do i do?

Chat with Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

How will I get my complete project?

Your Complete Project Material will be sent to your Email Address in Ms Word document format

Can I get my Complete Project through WhatsApp?

Yes! We can send your Complete Research Project to your WhatsApp Number

What if my Project Supervisor made some changes to a topic i picked from your website?

Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

Do you assist students with Assignment and Project Proposal?

Yes! Call Our Instant Help Desk Now: +234 813 292 6373 and you will be responded to immediately

What if i do not have any project topic idea at all?

Smiles! We've Got You Covered. Chat with us on WhatsApp Now to Get Instant Help: +234 813 292 6373

How can i trust this site?

We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "PRIMEDGE TECHNOLOGY". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!